|
Bigger and better
 Value engineering
keeps traffic flowing at North Little Rock interchange A miscalculation
of just 2 in. on a North Little Rock, Ark., bridge caused about a year's delay
on a $57.2 million, 6.3-mi. Interstate 40 project.
Full Story >> Value
engineering 
Knoxville interstate clears formidable design hurdle When two proposed
retaining walls flanking a bridge over Interstate 40 in Knoxville were estimated
at about $1,300 per sq. ft. - more than 10 times the usual cost - engineers decided
to take another route. Full
Story >> Constant
change  Alabama
projects are departures from the ordinary If there's anything constant
in military construction, it's change. Three contractors with a lot of experience
building military projects have re-discovered that truth on some diverse Alabama
jobs at Maxwell Air Force Base in Montgomery and Redstone Arsenal in Huntsville.
Full Story >> Military
buildup 
Mississippi bases make the most of increased funding These are busy
times for the military, and Mississippi's military installations are growing to
meet the challenge of fighting wars on two fronts and the terrorist threat at
home.
Full Story >>
|